CUSTOM EDC GEAR
Get inspired by our machining part projects and contact us to get instant quote for CUSTOM EDC GEAR parts start from 1pcs.

Hot EDC Gear We Made
Titanium Key Rings
Material: Titanium
Process: CNC Milling/Wire-Cut
Surface: Sand Blasting/Laser Engraving
MOQ: 100pcs
Lead Time: 7days
Titanium Key Chain
Material: Titanium Process: CNC Milling/Assembly Surface: Sand Blasting/Laser MOQ: 100pcs Lead Time: 7days
Titanium Pry Bar
Material: Titanium
Process: CNC Milling/Wire-Cut
Surface: Sand Blasting/PVD
MOQ: 100pcs
Lead Time: 7days
Steel EDC Container
Material: SUS304 Process: CNC Turning/Milling Surface: Polishing MOQ: 100pcs Lead Time: 7days
Steel Multi Tool bracelet
Material: SUS304 Process: CNC Milling Surface: Polishing MOQ: 100pcs Lead Time: 7days
Steel Gear Fidget Spinner
Material: SUS304 Process: CNC Milling/Lathe Surface: Polishing MOQ: 100pcs Lead Time: 7days
THE IMPORTANT THINGS YOU SHOULD KNOW (EDC GEAR)
EDC (Raw Materials)
EDC (Production Processes)
EDC (Surface Treatment)
EDC (Logo, Picture)
How much cost to make custom EDC gear?
Custom EDC gear is an emerging trend in the world of everyday carry, providing a unique way to customize and personalize your EDC items. But how much does it cost to make custom EDC gear? The answer depends on the complexity of the item, the materials used, and the machining and manufacturing costs. With careful planning and budgeting, custom EDC gear can be made at a reasonable cost which usually range $2.00 ~ $6.00, and take a look what effect the product unit cost to find out solution to save cost for your custom part projects.
- raw material cost is different between titanium & steel, the titanium material cost is 10 times higher than steel, and titanium is much difficult to be machined than steel material which means its manufacturing cost is much higher with a same design.
- complexity deisgn (geometry) requires more advanced machine such as 4-axis cnc and 5-axis cnc and takes longer machining time to finish a EDC gear, especially curved surface.
- surface treatment could be an element for the EDC gear cost, because some surface treatment is expensive such as PVD coating.
- quantity is always the key element for the custom EDC gear unit cost, because every manufacturing process has set up cost, and the manufacturing cost will keep going down as the quantity increasing, we usually set up different prices with different quantities: 1~20pcs; 20~100pcs; 100~500pcs; 500~1000pcs; 1000~5000pcs and more.
HOW TO WORKING WITH 3Q MACHINING
1. inquiry
Send inquiry to us those customs products you need and send us your detailed requirements, such as product CAD drawing, finishing, logo, package, quantities etc. Our sales support team will reply to you within 24 hours during Monday - Friday.
Send inquiry to us those customs products you need and send us your detailed requirements, such as product CAD drawing, finishing, logo, package, quantities etc. Our sales support team will reply to you within 24 hours during Monday - Friday.
2. nda (non-disclose agreement)
When you want to develop a custom design products which related to confidential information (such as drawing, design concepts), we sign NDA with you before we discuss any details.
When you want to develop a custom design mold products which related to confidential information (such as drawing, design concepts), we sign NDA with you before we discuss any details.
3. quotation & sample
We quote best prices & lead time for product or tooling after confirm all requirement information for your reviewing and consideration.
We quote best prices & lead time for product or tooling after confirm all requirement information for your reviewing and consideration.
4. pRODUCTION & INSPECTION
After receive deposit payment, we start mass production.During mass production, our quality department conduct in-process inspection and test, also have final pre-shipment inspection for customer review.
After receive deposit payment, we start mass production.During mass production, our quality department conduct in-process inspection and test, also have final pre-shipment inspection for customer review.
5.final payment & shipment
After receive final payment, we cooperate with your forwarder to book the shipment, cargo will arrive at your warehouse around 5~10 days by air shipment; Or 25~40 days by sea shipment.
After receive final payment, we cooperate with your forwarder to book the shipment, cargo will arrive at your warehouse around 5~10 days by air shipment; Or 25~40 days by sea shipment.